We Have Lift - Off
There goes the first section of bridge deck weighing in at hundreds of tonnes, it
was finally rested on the large yellow coloured trailer on top of a massive barge,
the tugs then manouvered it to the banking where the the load was winched onto
the shore and waiting mechanical breakers broke up the unit, saving only the
large steel beams seen in the picture, to be used in the construction of the new
units.